BRADFORD SCHOLARS

    • Sign in
    View Item 
    •   Bradford Scholars
    • Management and Law
    • Management and Law Publications
    • View Item
    •   Bradford Scholars
    • Management and Law
    • Management and Law Publications
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Bradford ScholarsCommunitiesAuthorsTitlesSubjectsPublication DateThis CollectionAuthorsTitlesSubjectsPublication Date

    My Account

    Sign in

    HELP

    Bradford Scholars FAQsCopyright Fact SheetPolicies Fact SheetDeposit Terms and ConditionsDigital Preservation Policy

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    The latent causes of rework in floating production storage and offloading projects

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Publication date
    2014
    Author
    Love, P.E.D.
    Edwards, D.J.
    Irani, Zahir
    Forcada, N.
    Keyword
    Conversion; Errors; FPSO; Learning; Rework; New build, Retrospection; Sensemaking
    Peer-Reviewed
    Yes
    
    Metadata
    Show full item record
    Abstract
    There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects are prone to significant cost and schedule growth. On average, FPSOs have been reported to experience a 20% cost growth and are delayed by six months. Overruns and delays represent uncertainties for owners, contractors and financial institutions. In-depth interviews with twenty-three practitioners about their experiences with FPSO projects revealed that rework arising from design and construction errors were major contributors to cost and schedule growth. Key latent conditions contributing to rework are classified according to people, organization and project. Using retrospective sensemaking an examination of the determinant histories in a new build and conversion FPSO that experienced rework was undertaken. The sharing of experience(s) is deemed pivotal for reducing rework in future projects, particularly through the use of communities of practice that are able to stimulate situated learning to take place. A reduction in rework will not only reduce cost and schedule growth, improve operational performance and augment safety.
    URI
    http://hdl.handle.net/10454/14102
    Version
    No full-text in the repository
    Citation
    Love PED, Edwards DJ, Irani Z et al (2014) The latent causes of rework in floating production storage and offloading projects. Journal of Civil Engineering and Management. 20(3): 315-329.
    Link to publisher’s version
    https://doi.org/10.3846/13923730.2013.802725
    Type
    Article
    Collections
    Management and Law Publications

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.