Maintenance Scheduling With Delay-time Modelling - An Overview

dc.contributor.authorDu, Jing-Yu
dc.contributor.authorLi, Jian-Ping
dc.contributor.authorHu, Yim Fun
dc.contributor.authorGuan, X.
dc.contributor.authorSi, M.
dc.contributor.authorLiu, B.
dc.date.accepted2021-08-01
dc.date.accessioned2021-12-22T15:29:38Z
dc.date.available2021-12-22T15:29:38Z
dc.date.issued2021-09-01
dc.descriptionNoen_US
dc.description.abstractEffective maintenance is a key for infrastructures’ high operational reliability. The integration of corrective repairs and schedule-based failure preventions has been a mainstream of modern maintenance, and an associated policy-making technique, delay-time modelling, is overviewed in this paper for optimising the maintenance cost-efficiency in different practical scenarios, including imperfect, opportunistic and nested maintenance. A few typical examples of its applications in minimising maintenance operating expenses are discussed in this paper and their results are explained to better demonstrate the benefits of the technique. This work aims to prepare for the future applications of the delay-time modelling in railway maintenance policy making.en_US
dc.identifier.citationDu J, Li J, Hu YF et al (2021) Maintenance Scheduling with Delay-time Modelling: An Overview. International Journal of Plant Engineering and Management. 26(3): 129-149.en_US
dc.identifier.doihttps://doi.org/10.13434/j.cnki.1007-4546.2021.0301
dc.identifier.urihttp://hdl.handle.net/10454/18709
dc.language.isoenen_US
dc.openaccess.statusNot Open Accessen_US
dc.status.refereedYesen_US
dc.subjectMaintenanceen_US
dc.subjectFailure preventionen_US
dc.subjectDelay-time modellingen_US
dc.subjectCost minimisationen_US
dc.titleMaintenance Scheduling With Delay-time Modelling - An Overviewen_US
dc.typeArticleen_US
dc.type.versionNo full-text in the repositoryen_US
dspace.entity.typePublication
refterms.dateFOA2021-12-22T15:30:04Z
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Maintenance Scheduling with Delay-time Modelling An Overview.PDF
Size:
1.56 MB
Format:
Adobe Portable Document Format
Description:
Keep suppressed - no permission to host received (SN)