Estimation of shutdown schedule to remove fouling layers of heat exchangers using risk-based inspection (RBI)
Elwerfalli, A. ; Alsadaie, S. ;
Elwerfalli, A.
Alsadaie, S.
Publication Date
2021-12-02
End of Embargo
Supervisor
Rights
(c) 2021 The Authors. This is an Open Access article distributed under the Creative Commons CC-BY license (https://creativecommons.org/licenses/by/4.0/)
Peer-Reviewed
Yes
Open Access status
openAccess
Accepted for publication
2021-11-29
Institution
Department
Awarded
Embargo end date
Additional title
Abstract
Oil and Gas plants consist of a set of heat exchangers, which are used in recovering the waste heat from product streams to preheat the oil. The heat transfer coefficient of exchangers declines considerably during the operation period due to fouling. Fouling in heat exchangers is a complex phenomenon due to the acceleration of many layers of chemical substances across tubes of heat exchangers resulting from chemical reactions and surface roughness. In this paper, the fouling process was determined as a critical failure in the heat exchanger. Failure is an accelerated fouling layer across the heat exchanger tubes, which can be the reason for the clogging of tubes. Hence, a risk assessment was conducted using the Risk-Based Inspection (RBI) approach to estimate the probability of fouling in heat exchangers. The results showed that the RBI approach can be used successfully to predict the suitable time to shut down the plant and conduct the fouling cleaning process.
Version
Published version
Citation
Elwerfalli A, Alsadaie S and Mujtaba IM (2021) Estimation of shutdown schedule to remove fouling layers of heat exchangers using risk-based inspection (RBI). Processes. 9(12).
Link to publisher’s version
Link to published version
Link to Version of Record
Type
Article