BRADFORD SCHOLARS

    • Sign in
    View Item 
    •   Bradford Scholars
    • University of Bradford eTheses
    • Theses
    • View Item
    •   Bradford Scholars
    • University of Bradford eTheses
    • Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Bradford ScholarsCommunitiesAuthorsTitlesSubjectsPublication DateThis CollectionAuthorsTitlesSubjectsPublication Date

    My Account

    Sign in

    HELP

    Bradford Scholars FAQsCopyright Fact SheetPolicies Fact SheetDeposit Terms and ConditionsDigital Preservation Policy

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Risk analysis in mangement planning and project control. (Probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty)

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    View/Open
    Ashrafi.pdf (12.65Mb)
    Download
    Publication date
    2009-10-02T15:00:00Z
    Author
    Ashrafi, Rafi A.
    Supervisor
    Keller, A.Z.
    Keyword
    Risk analysis
    Management planning
    Project management
    Engineering industry
    Construction industry
    Organisational structure
    Proababalistic techniques
    Rights
    Creative Commons License
    The University of Bradford theses are licenced under a Creative Commons Licence.
    Institution
    University of Bradford
    Department
    Industrial Technology
    Awarded
    1981
    
    Metadata
    Show full item record
    Abstract
    Effective estimation, planning, and control of the functions, operations, and resources of a project are among the most challenging tasks faced by the management of today's engineering and construction organisations. The increase in size and complexity of modern projects demand a sound organisational structure and a rational approach. The main objectives of the present study are two-fold. Firstly to report and critically review theoretical and practical developments of different aspects of the management of engineering and construction projects. Secondly to further develop conceptual, practical techniques and processes; also to provide Guidelines to make more effective use. of resources and systems. To achieve these objectives the present research was carried out in close collaboration with various indurtrial organisations. The current literature on project management is critically examined from the point of View of project cost estimation, planning and control. Various existing and recommended procedures, approaches and techniques are reviewed with particular emphasis on using probabilistic techniques. As the problems of scale are increasing, progressively more industries are adopting systems and project management approaches. Problems, deficiencies and gaps in the existing systems are identified. An analysis of a questionnaire survey on Systems-Caps is carried out and the results of the analysis are reported. . S-curves (or progress curves) are widely used in the plauaing and control of cost, time and resources. A mathematical model for the S-curve is adopted for this purpose. Expenditure data on a number of ii recent projects is analysed and fitted to two S-curve models suggested by Keller-Singh and the Department of Health and Social Security (D. H. S. S. ). A comparative study of the models is carried out. A set of standard parameters for the models is obtained and the predicting accuracy of these models for forecasting expenditure for future similar projects investigated. Quantification aspects of risk involved with the completion time of a project are studied. 'A number of stochastic distributions arc fitted for this purpose to the programed and actual durations for the different activities of a housing project. The maximum likelihood method is used for the estimation of parameters of the fitted distributions. Due to the increasing use of indices in the construction industry, building cost and tender price indices, their application, limitations and methods of formation are discussed. Box-Jenkins models are employed to study past behaviour and to forecast future trends for labour, materials and building cost indices. Finally, general conclusions derived from the present regearch are sunmarised and areas requiring further research are proposed.
    URI
    http://hdl.handle.net/10454/3572
    Type
    Thesis
    Qualification name
    PhD
    Collections
    Theses

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.