BRADFORD SCHOLARS

    • Sign in
    View Item 
    •   Bradford Scholars
    • Engineering and Informatics
    • Engineering and Informatics Publications
    • View Item
    •   Bradford Scholars
    • Engineering and Informatics
    • Engineering and Informatics Publications
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Bradford ScholarsCommunitiesAuthorsTitlesSubjectsPublication DateThis CollectionAuthorsTitlesSubjectsPublication Date

    My Account

    Sign in

    HELP

    Bradford Scholars FAQsCopyright Fact SheetPolicies Fact SheetDeposit Terms and ConditionsDigital Preservation Policy

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Scheduling Infrastructure Renewal for Railway Networks

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    View/Open
    dao_et_al_2019.pdf (3.907Mb)
    Download
    Publication date
    2019-12
    Author
    Dao, Cuong D.
    Hartmann, A.
    Lamper, A.
    Herbert, P.
    Keyword
    Economic infrastructure
    Assets
    Mathematics
    Infrastructure
    Scheduling
    Mathematical models
    Rail transportation
    Case studies
    Netherlands
    Europe
    Rights
    (c) 2019 ASCE. This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://doi.org/10.1061/(ASCE)IS.1943-555X.0000515.
    Peer-Reviewed
    Yes
    
    Metadata
    Show full item record
    Abstract
    The pressing necessity to renew infrastructure assets in developed railway systems leads to an increased number of activities to be scheduled annually. Scheduling of renewal activities for a railway network is a critical task because these activities often require a significant amount of time and create a capacity conflict in operation scheduling. This paper discusses economic and technological aspects, opportunities, and constraints in the renewals of multiple rail infrastructure components at several locations in a railway network. We addressed and modeled a challenging situation in which there were interrelationships between different track lines, and thus, possession of a track line could affect the other track lines and prevent renewal works on them. A mathematical formulation for the railway infrastructure renewal scheduling problem in the network context was presented to minimize the total renewal and unavailability costs. A method based on a triple-prioritization rule and an optimal sharing of renewal times allocated for different types of rail infrastructure components in a possession is proposed to solve the problem. The method was applied to a real case of a regional railway network in Northern Netherlands and it was shown that up to 13% of total costs can be saved compared with the current scheduling practice.
    URI
    http://hdl.handle.net/10454/17977
    Version
    Accepted manuscript
    Citation
    Dao CD, Hartmann A, Lamper A et al (2019) Scheduling Infrastructure Renewal for Railway Networks. Journal of Infrastructure Systems. 25(4): 04019027.
    Link to publisher’s version
    https://doi.org/10.1061/(ASCE)IS.1943-555X.0000515
    Type
    Technical paper
    Collections
    Engineering and Informatics Publications

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.