Show simple item record

dc.contributor.authorDao, Cuong D.
dc.contributor.authorBasten, R.
dc.contributor.authorHartmann, A.
dc.date.accessioned2020-08-06T16:03:00Z
dc.date.accessioned2020-08-17T14:18:28Z
dc.date.available2020-08-06T16:03:00Z
dc.date.available2020-08-17T14:18:28Z
dc.date.issued2018-08
dc.identifier.citationDao CD, Basten R and Hartmann A (2018) Maintenance scheduling for railway tracks under limited possession time. Journal of Transportation Engineering Part A: Systems. 144(8): 04018039.en_US
dc.identifier.urihttp://hdl.handle.net/10454/17972
dc.descriptionYesen_US
dc.description.abstractMaintenance planning for busy railway systems is challenging because there is growing pressure on increasing operation time, which reduces the infrastructure-accessible time for maintenance. This paper proposes an optimization model that is aimed at finding the best maintenance schedule for multiple components in a railway track to minimize the total cost in the planning horizon. One distinct and practical feature of the model is that the track accessible time for maintenance is limited. We formulate all relevant costs in the component's life cycle, including maintenance cost, fixed track-closure (possession) cost, social-economic cost related to the effects of maintenance time on the train operation, and service-life shortening cost due to the shifting of activities. Generally, it is beneficial to cluster and maintain several components in a single possession because this helps reduce the cost by occupying the track only once. However, the decision must depend on the available possession time. A sensitivity analysis is performed to highlight the effects of available possession time on the number of required possessions as well as the total cost incurred.en_US
dc.language.isoenen_US
dc.relation.isreferencedbyhttps://doi.org/10.1061/JTEPBS.0000163en_US
dc.rights(c) 2018 ASCE. This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://doi.org/10.1061/JTEPBS.0000163.en_US
dc.subjectRailway maintenanceen_US
dc.subjectSchedulingen_US
dc.subjectAccessibilityen_US
dc.subjectTrack-closureen_US
dc.titleMaintenance scheduling for railway tracks under limited possession timeen_US
dc.status.refereedYesen_US
dc.date.Accepted2018-02-16
dc.date.application2018-05-29
dc.typeTechnical paperen_US
dc.type.versionAccepted manuscripten_US
dc.date.updated2020-08-06T15:03:02Z
refterms.dateFOA2020-08-18T06:35:04Z


Item file(s)

Thumbnail
Name:
dao_et_al_2020.pdf
Size:
416.8Kb
Format:
PDF
Description:
Updated file with figures
Thumbnail
Name:
dao_et_al_2018.pdf
Size:
245.6Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record