BRADFORD SCHOLARS

    • Sign in
    View Item 
    •   Bradford Scholars
    • University of Bradford eTheses
    • Theses
    • View Item
    •   Bradford Scholars
    • University of Bradford eTheses
    • Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Bradford ScholarsCommunitiesAuthorsTitlesSubjectsPublication DateThis CollectionAuthorsTitlesSubjectsPublication Date

    My Account

    Sign in

    HELP

    Bradford Scholars FAQsCopyright Fact SheetPolicies Fact SheetDeposit Terms and ConditionsDigital Preservation Policy

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Success factors in information technology projects

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    View/Open
    PhD Thesis (2.183Mb)
    Download
    Publication date
    2015
    Author
    Sehele, Abdulallah A.A.
    Supervisor
    Analoui, Farhad
    Keyword
    Project Management; IT projects; Project Success and Failure; National Guard Health Affairs; Saudi Arabia
    Rights
    Creative Commons License
    The University of Bradford theses are licenced under a Creative Commons Licence.
    Institution
    University of Bradford
    Department
    Faculty of Social Sciences, Bradford Centre for International Development
    Awarded
    2015
    
    Metadata
    Show full item record
    Abstract
    Concern for project failures and successes have posed a controversial and much debated topic amongst scholars and practitioners alike. IT projects are no exceptions and they too suffer from a high rate of failure. This research aims to explore the reasons why certain IT projects succeed). Besides its academic importance, the research intends to assess the implications for successful implementation of current and future IT projects. The review of the extant literature reveals the enormity of the challenges involved in minimising or avoiding project failures. Present work is contextualizing these issues in a large national organisation with branches throughout the KSA. The Saudi Arabia constitutes the case study for this research. Qualitative methodology was adopted to generate and collect adequate and relevant data. Main instruments were; Semi-structured interviews involving senior managers in five geographical areas who were involved in the management of the IT projects and selected project documents. Thematic analysis was used and led to emergence of seven main ‘themes’, 19 major ‘issues’, and the construction of the first time generic model for success of IT projects. The core issues identified in the model are: Quality, Time and Cost at three levels; individual, organisation and environment with specific order of importance. The implications of the findings for the theory and practice have been identified. It is also recommended that there is a need for further research into individual and contextual factors that influence both managers as well as the circumstances under which IT projects are implemented.
    URI
    http://hdl.handle.net/10454/14420
    Type
    Thesis
    Qualification name
    PhD
    Collections
    Theses

    entitlement

     
    DSpace software (copyright © 2002 - 2022)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.