Show simple item record

dc.contributor.authorLiu, H.J.*
dc.contributor.authorLove, P.E.D.*
dc.contributor.authorSmith, J.*
dc.contributor.authorIrani, Zahir*
dc.contributor.authorHajli, N.*
dc.contributor.authorSing, M.C.P.*
dc.date.accessioned2017-12-08T11:46:53Z
dc.date.available2017-12-08T11:46:53Z
dc.date.issued2018
dc.identifier.citationLiu HJ, Love PED, Smith J et al (2018) From design to operations: a process management life-cycle performance measurement system for Public-Private Partnerships. Production Planning and Control. 29(1): 68-83.en_US
dc.identifier.urihttp://hdl.handle.net/10454/14129
dc.descriptionYes
dc.description.abstractPublic–Private Partnerships (PPPs) have become a critical vehicle for delivering infrastructure worldwide. Yet, the use of such a procurement strategy has received considerable criticism, as they have been prone to experiencing time/cost overruns and during their operation poorly managed. A key issue contributing to the poor performance of PPPs is the paucity of an effective and comprehensive performance measurement system. There has been a tendency for the performance of PPPs to be measured based on their ex-post criteria of time, cost and quality. Such criteria do not accommodate the complexities and lifecycle of an asset. In addressing this problem, the methodology of sequential triangulation is used to develop and examine the effectiveness of a ‘Process Management Life Cycle Performance Measurement System’. The research provides public authorities and private-sector entities embarking on PPPs with a robust mechanism to effectively measure, control and manage their projects’ life cycle performances, ensuring the assets are ‘future proofed’.en_US
dc.language.isoenen_US
dc.rights© 2017 Taylor & Francis. This is an Author's Original Manuscript of an article published by Taylor & Francis in Production Planning & Control on 04 Oct 2017 available online at https://doi.org/10.1080/09537287.2017.1382740
dc.subjectPPPs
dc.subjectInfrastructure asset
dc.subjectPerformance measurement
dc.subjectFuture proofing
dc.subjectAustralia
dc.titleFrom design to operations: a process management life-cycle performance measurement system for Public-Private Partnershipsen_US
dc.status.refereedYes
dc.date.application04/10/2017
dc.typeArticle
dc.type.versionAccepted manuscript
dc.identifier.doihttps://doi.org/10.1080/09537287.2017.1382740
refterms.dateFOA2018-10-05T09:54:55Z
dc.openaccess.statusopenAccess
dc.date.accepted11/09/2017


Item file(s)

Thumbnail
Name:
Irani_Production_Planning_&_Co ...
Size:
1.806Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record