From design to operations: a process management life-cycle performance measurement system for Public-Private Partnerships
View/ Open
Irani_Production_Planning_&_Control.pdf (1.806Mb)
Download
Publication date
2018Rights
© 2017 Taylor & Francis. This is an Author's Original Manuscript of an article published by Taylor & Francis in Production Planning & Control on 04 Oct 2017 available online at https://doi.org/10.1080/09537287.2017.1382740Peer-Reviewed
YesOpen Access status
openAccess
Metadata
Show full item recordAbstract
Public–Private Partnerships (PPPs) have become a critical vehicle for delivering infrastructure worldwide. Yet, the use of such a procurement strategy has received considerable criticism, as they have been prone to experiencing time/cost overruns and during their operation poorly managed. A key issue contributing to the poor performance of PPPs is the paucity of an effective and comprehensive performance measurement system. There has been a tendency for the performance of PPPs to be measured based on their ex-post criteria of time, cost and quality. Such criteria do not accommodate the complexities and lifecycle of an asset. In addressing this problem, the methodology of sequential triangulation is used to develop and examine the effectiveness of a ‘Process Management Life Cycle Performance Measurement System’. The research provides public authorities and private-sector entities embarking on PPPs with a robust mechanism to effectively measure, control and manage their projects’ life cycle performances, ensuring the assets are ‘future proofed’.Version
Accepted manuscriptCitation
Liu HJ, Love PED, Smith J et al (2018) From design to operations: a process management life-cycle performance measurement system for Public-Private Partnerships. Production Planning and Control. 29(1): 68-83.Link to Version of Record