dc.contributor.authorLove, P.E.D.*
dc.contributor.authorIrani, Zahir*
dc.contributor.authorSmith, J.*
dc.contributor.authorRegan, M.*
dc.contributor.authorLiu, J.*
dc.date.accessioned2017-12-08T11:41:33Z
dc.date.available2017-12-08T11:41:33Z
dc.date.issued2017
dc.identifier.citationLove PED, Irani Z, Smith J et al (2017) Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Production Planning and Control. 28(13): 1081-1092.en_US
dc.identifier.urihttp://hdl.handle.net/10454/14128
dc.descriptionYesen_US
dc.description.abstractThe cost performance of a wide range of public sector infrastructure projects completed by a contractor are analysed and discussed. Change-orders after a contract to construct an asset was signed were, on average, found to contribute to a 23.75% increase in project costs. A positive association between an increase in change orders and the contractor’s margin were identified. Taxpayers pay for this additional cost, while those charged with constructing assets are rewarded with an increase in their margins. As the public sector embraces an era of digitisation, there is a need to improve the integration of design and construction activities and engender collaboration to ensure assets can be delivered cost effectively and future-proofed. The research paper provides empirical evidence for the public sector to re-consider the processes that are used to deliver their infrastructure assets so as to reduce the propensity for cost overruns and enable future-proofing to occur.en_US
dc.language.isoenen_US
dc.relation.isreferencedbyhttps://doi.org/10.1080/09537287.2017.1333647en_US
dc.rights© 2017 Taylor & Francis. This is an Author's Original Manuscript of an article published by Taylor & Francis in Production Planning and Control on 29 May 2017 available online at https://doi.org/10.1080/09537287.2017.1333647
dc.subjectChange-orders; Public sector; Cost performance; Infrastructure; Procurementen_US
dc.titleCost performance of public infrastructure projects: the nemesis and nirvana of change-ordersen_US
dc.status.refereedYesen_US
dc.date.Accepted2017-05-10
dc.date.application2017-05-29
dc.typeArticleen_US
dc.type.versionAccepted Manuscripten_US
refterms.dateFOA2018-07-29T03:26:10Z