Low energy pre-blended mortars: Part 1-Control of the sand drying process using a lime drying technique
Hughes, David C. ; Illingworth, J.M.
Hughes, David C.
Illingworth, J.M.
Publication Date
2015-12-30
End of Embargo
Supervisor
Rights
Peer-Reviewed
Yes
Open Access status
closedAccess
Accepted for publication
2015-10-14
Institution
Department
Awarded
Embargo end date
Additional title
Abstract
Produttion control methods allow factory produced mortars to be supplied to a more consistent formulation than site produced mortars. However, there is scope to enhance their "sustainability" credentials by addressing the methods of drying the wet sand and the use of lower energy hydraulic components. This paper describes the development of a technique in which quicklime is added in controlled quantities to remove free water by both chemical combination and evaporation. The slaked lime so generated is porous and a third mechanism of absorption is suggested which, however, might have adverse effects during storage of the pre-blended mortar. The principal process-control factors are lime addition based upon a ratio of the stoichiometric requirements for complete slaking of the quicklime, free moisture content of the sand, mixing time of the combined sand and quicklime, and storage of the mixed material. (C) 2015 Elsevier Ltd. All rights reserved.
Version
No full-text in the repository
Citation
Hughes DC and Illingworth JM (2015) Low energy pre-blended mortars: Part 1-Control of the sand drying process using a lime drying technique. Construction and Building Materials. 101(1): 466-473.
Link to publisher’s version
Link to published version
Link to Version of Record
Type
Article